To: President Donald Trump, The Massachusetts State House, The Massachusetts State Senate, Governor Charlie Baker, The United States House of Representatives, and The United States Senate

Decommission aging Mark 1 nuclear reactors

End dangerous, expensive nuclear power and replace it with efficiency and renewable energy sources. For our economic future and our children's safety, we demand the closure and prompt decommissioning of all U.S. Mark 1 Boiling Water Reactors. No more Fukushimas!

Why is this important?

The Fukushima multiple nuclear meltdown proved that the GE Mark 1 Boiling Water Reactor has a defective containment and is vulnerable to hydrogen explosions in a loss of power accident. Because the spent fuel pools, filled to bursting, are situated on top of these old reactors, an explosion can spread the highly irradiated spent fuel up to a mile away, as at Fukushima, and air and water contamination across continents. The Pilgrim reactor in Plymouth, MA and the VT Yankee reactor in Vernon Vermont are of the Fukushima design. They are 40 years old, running above their designed power load, leaking, embrittled, outmoded, out of compliance or exempt from NRC's own fire safety and other regulations, and should be retired and decommissioned at once. The risk of an accident with such enormous consequences should demand immediate precautionary action, as was taken by Germany, Japan, and other countries. As Fukushima showed, the risk of catastrophe with Mark 1 reactors is just a power failure away. Retire all Mark 1 BWR's.